Mechanical Biological Treatment Facility in Gaziantep, Turkey
The project “Technical Design and Engineering Services for Waste to Energy and Sludge Management Facilities / LOT 1: Mechanical Biological Treatment Facility (Pre-feasibility, conceptual design and EIA Services)”, was implemented for the Municipality of Gaziantep, Turkey, and funded by the UNDP (EU-UNDP Turkey Resilience Project-C2: Municipal Service Delivery / RFP No: (MC2)-2018/05).
For the establishment of the MBT facility, EPEM Engineering undertook the elaboration of the Feasibility Study (including the Survey and Geo-hydrological Studies) and the Environmental Impact Assessment Study, and prepared the Employer’s requirements (Yellow FIDIC) with Conceptual Design and Cost Estimate.
With its 10 million USD investment cost, the MBT is one of the largest projects of UNDP. MORE INFO